Overview

Prime High-Bay Logistics Facility

Prime high-bay logistics facility currently under construction by Park Development Group with practical completion scheduled for early Quarter 2 2020. Warehouse Approx. 15m clear internal height 4 automated dock levellers and 2 ground level automated insulated sectional doors 5m high by 4m wide Insulated metal deck roof with translucent panels High bay LED lighting 2.4 metre high perimeter concrete walls to inside of external warehouse walls Sealed concrete floors with loading capacity of 50 kn/m2 35 metre yard depth Office Painted and plastered walls Suspended ceilings Recessed LED lighting Air source heat pump central heating Perimeter trunking Toilets Kitchenette Location  Northwest Logistics Park is one of Dublin’s premier and most established logistics locations. The park is within 700m of the of the N2/N3 link road which provides dual carriageway access to the N2 & N3 routes and Junctions 5 & 6 on the M50, which are within 7.5km of the property.
Less

Sizes and Measurements

Total Size

3,716sqm

Schedule of Accommodation

Office

Details

Industrial

Size

370sqm

Status

Available

For rent

Price On Application

Available from

Immediately

Warehouse

Details

Industrial

Size

3,346sqm

Status

Available

For rent

Price On Application

Available from

Immediately

Lease Information & Charges

Lease type

Unknown

For rent

Price On Application

Specification/Key Benefits

  • 4 Dock Levellers
  • Air source heat pump central heating Heating
  • High bay LED lighting Lighting
  • 14 meters m Clear Internal Height
  • 2 Roller Shutter Doors
  • Quality of space: New

Location

  • 5 kilometres from M50 Motorway - Junction 5 (N2)
  • 6 kilometres from M50 Motorway - Junction 6 (N3)
  • 15 kilometres from Dublin Airport
  • 14.5 kilometres from Dublin Port Tunnel
  • 12 kilometres from Dublin City Centre

Photos

WAREHOUSE-FRONT _2_
WAREHOUSE-REAR _1_