Overview

MODERN HIGH BAY LOGISTICS FACILITIES

Construction delivery can be achieved within approx. 9 monthsALL NEW UNITS WILL BE FINISHED TO THE HIGHEST SPECIFICATION Warehouse Specification Up to 15 m clear internal heightDock levellers with tailgate loading to all unitsAutomated insulated sectional doors to all unit2.1 metre high concrete walls to inside of external warehouse wallsSealed concrete floors with loading capacity of 50 kn/m2 Office Specification Painted and plastered wallsSuspended ceilingsRecessed LED lightsGas fired central heatingPerimeter trunkingToilets and tea stationsLocation Northwest Logistics Park is one of Dublin’s premier and most established logistics locations. The park is within 200m of the of the N2/N3 link road which provides dual carriageway access to the N2 (J3) & N3 (J2) routes, both of which are within 2kms of Northwest Logistics Park. Northwest Logistics Park is within 5kms of J5 & J6 on the M50 which provides motorway access to all of the main arterial routes from Dublin, to Dublin International Airport and the Port Tunnel. The logical location for Logistics.
Less

Sizes and Measurements

Total Size

3,811sqm

Schedule of Accommodation

Warehouse

Details

Industrial

Size

3,439sqm

Status

Available

For sale

Price On Application

Available from

Immediately

Office

Details

Industrial

Size

372sqm

Status

Available

For sale

Price On Application

Available from

Immediately

Lease Information & Charges

For sale

Price On Application

Specification/Key Benefits

  • 11% % Office Content
  • 2.18 Acre(s) Site Area
  • Exempt BER Certification
  • 4 Dock Levellers
  • 2 Grade Level Doors
  • 14.8 m Clear Internal Height
  • Quality of space: New

Location

  • 12 kilometres from Dublin City Centre
  • 14.5 kilometres from Dublin Port Tunnel
  • 15 kilometres from Dublin Airport
  • 6 kilometres from M50 Motorway - Junction 6 (N3)
  • 5 kilometres from M50 Motorway - Junction 5 (N2)

Photos

HAN_C2_1-DD